Appointing a planned maintenance contractor for a residential or mixed-use London block shapes budgets, compliance records and resident relationships for years. A strong tender process looks past the headline annual figure and tests how the contractor actually surveys, staffs, documents and delivers planned maintenance on site.
What to include in your contractor brief and RFI
A clear brief prevents like-for-like confusion at tender stage. Before asking a planned maintenance contractor to price an annual programme, assemble the current asset register (or flag where one still needs compiling), building access rules, parking and loading constraints, permitted working hours for occupied blocks, and any porter or concierge sign-in procedures.
Set out the reporting standard you expect from day one: monthly programme summaries, photographic visit records, separate defect quotations and how statutory certificates should be labelled for your property management file. Ask each bidder to state plainly which trades they deliver in house and which specialist elements they subcontract.
- Building profile, asset list and any overdue compliance or remedial items
- Occupied-building controls: resident notice periods, noisy-work hours, key holding and shared-route protection
- Reporting format, certificate turnaround and how reactive defects outside the planned schedule are approved
- Clear split of directly employed trades versus vetted specialist subcontractors, plus a named contract contact
Checking multi-trade delivery against subcontractor-heavy models
Many planned maintenance proposals promise a single point of contact while relying almost entirely on an external chain of subcontractors. In a busy London block, that difference shows up quickly when a fault spans two trades, when access windows are tight, or when certificates take weeks to chase back from third parties.
Test how the contractor coordinates multi-trade work in practice: ask who attends a leak that needs plumbing, carpentry and redecoration, who owns repeat visits if a repair fails, and how specialist subcontractors are vetted before arriving on site. For a broader look at comparing delivery models across a portfolio, see our guide on choosing a multi-trade contractor.
Verifying insurance and engineer accreditations
Check insurance schedules before contract award rather than relying on a tick-box form. Instant Maintenance & Building Services carries £10m public liability and £10m employer's liability cover, and buyers should ask any prospective planned maintenance contractor to evidence current public and employer's liability policies alongside cover for any specialist subcontractor attending the building.
Confirm scheme registration against the regulated work in your block. Gas work must be carried out by Gas Safe registered engineers, electrical testing and remedials by NICEIC or NAPIT registered electricians, fire alarm servicing by BAFE registered contractors, and passive fire stopping under recognised third-party certification schemes. Ask how registrations are verified before attendance and how the resulting certificates are issued into your compliance file.
RAMS, occupied-block controls and Section 20 alignment
Risk assessments and method statements (RAMS) should be issued before attendance so the building manager or surveyor can review access routes, resident protection and isolation procedures in advance. Look for site-specific RAMS that reflect the actual plant rooms, risers, entrances and roof access rather than generic paperwork sent on the morning of the visit.
Where a planned maintenance contract is structured as a qualifying long-term agreement lasting more than 12 months, or where associated cyclical works cross statutory contribution thresholds, Section 20 consultation must sit inside your procurement timetable before signing. Check the thresholds early so consultation periods do not hold up mobilisation; we set out the rules in full in our Section 20 thresholds guide.
Evaluating photo and completion reporting
Planned maintenance only protects a managing agent or RMC if the records hold up when an insurer, auditor, lender or tribunal asks for them. Ask every shortlisted contractor for a redacted sample of their actual visit report and monthly programme summary.
- Dated visit records tied to individual asset references rather than generic sign-in sheets
- Before-and-after photographs for fabric inspections, communal checks and completed remedials
- Statutory certificates issued alongside the visit record, clearly matched to the building and asset
- Defects found during planned visits raised as itemised recommendations for approval, never buried in an unexplained invoice
Running a practical site survey before signing an annual schedule
Avoid awarding an annual planned maintenance schedule off a desktop spreadsheet alone. Walk shortlisted contractors through the building: plant rooms, risers, roof access, communal areas, bin stores and external elevations. A contractor who photographs existing assets, checks labelling on distribution boards and asks detailed questions about water hygiene, fire doors and drainage will give you a far more dependable price.
Use the survey to separate immediate catch-up remedials from routine cyclical servicing before the contract begins. For a full breakdown of the statutory and fabric items to put on the calendar, read our guide on what a PPM schedule should include for a residential block.
Further reading
- Planned preventative maintenance in London
- Planned maintenance in Kensington and Chelsea
- Planned maintenance in Southwark and SE1
- Planned maintenance in Westminster
- What a PPM schedule should include for a residential block
- Section 20 thresholds explained: the £250 and £100 rules
- Request a free site survey