A lettings agent's 7-day void turnaround in London

27/11/2026 · 6 min read

5.0 on Google (230 reviews) · £10m public & employer's liability

A seven-day void turnaround is a typical, well-organised programme for a standard London tenancy changeover when the survey, approvals and trades run in sequence. It is not a guaranteed seven-day SLA: actual timescales depend on the condition found at survey, key and block access, material lead times, compliance appointments and building management rules.

When a 7-day programme fits and what shifts it

A week-long sequence fits routine re-let works: clearance of left items, minor plumbing and electrical repairs, statutory safety checks, carpentry snagging, plastering and redecoration, followed by a deep clean. Flats needing full kitchen or bathroom replacement, damp remediation, specialist part orders or extensive EICR remedials naturally take longer and should be programmed transparently from the survey.

Treating seven days as a practical working benchmark rather than a fixed promise keeps landlord expectations realistic and focuses everyone on removing avoidable admin delays. For how to package scopes under one approval, read our companion note on cutting days off empty properties, and keep our void turnaround checklist to hand during inspections.

Day 1: check-out alignment, multi-trade survey and approved scope

Day one sets the pace for the rest of the void. Once keys are released and the check-out inventory is available, a multi-trade surveyor inspects the whole property in one visit rather than arranging separate quotes from a plumber, electrician, carpenter and decorator.

  • Room-by-room photographic baseline taken before clearance or repairs begin
  • Full check of locks, windows, doors, flooring, kitchen units, sanitaryware, lighting, heating and extract fans
  • Clear separation of landlord maintenance items from potential deposit-deduction damage
  • One itemised scope returned promptly so the agent and landlord can approve the complete package together

Days 2 to 4: parallel works under one coordinator

The biggest time saver in a London void is replacing four separate trade bookings with one coordinator sequencing parallel works. Clearance and wet or noisy repairs move first, with decorating and finishing staged as soon as surfaces are sound and dry.

  • Plumbing and electrical repairs: traps, taps, seals, sockets, lighting and extractor fan faults
  • Compliance appointments: EICR testing and gas safety checks delivered by NICEIC or NAPIT registered electricians and Gas Safe registered engineers, with minor approved remedials closed promptly
  • Carpentry and snagging: easing doors, replacing latches, handles, hinges, skirting sections and worn trims
  • Plastering and decorating: filling, stain blocking, sanding, priming and repainting to the agreed letting standard

Days 5 to 6: deep clean, touch-ups and photo sign-off

Once trade works and redecoration finish, tools, sheeting and waste are removed before a full post-works deep clean covering appliances, cupboards, bathrooms, internal glazing, frames and floors. Booking the clean before the final trade leaves almost always forces a repeat visit.

On day six, the supervisor walks every room against the approved scope and check-out notes, completes minor paint or mastic touch-ups, checks smoke and carbon monoxide alarms, and captures completion photographs matching the day-one baseline.

Day 7: key handover and completion pack for the re-let file

Keys are returned to the lettings desk or handed over ahead of the check-in inventory alongside a single completion pack. Delivering photographs and certificates together lets the agent confirm move-in readiness without chasing separate trades for paperwork.

  • Before-and-after completion photographs organised room by room
  • Gas safety record, EICR or minor works certificates where instructed, and alarm test confirmation
  • Waste transfer notes where clearance and disposal were included
  • One consolidated invoice matched to the approved scope and any agreed variations

How agents avoid the usual void-period delays

  • Book the multi-trade survey ahead of check-out so keys move straight from the inventory clerk to the surveyor
  • Approve one itemised scope rather than issuing separate instructions across two weeks
  • Confirm concierge sign-in, lift protection, parking permits and noisy-work hours in managed blocks before day one
  • Check gas and EICR expiry dates early so compliance visits sit inside days two to four rather than delaying check-in
  • Agree a repeat letting specification for portfolio landlords so paint colours and fittings do not need re-approving on every flat

Ask us to take a look.

Whatever's come up across your portfolio, a single repair or a full refurbishment programme, we'd welcome the chance to quote. Site surveys and quotes are free, so there's no cost or commitment in simply asking us to take a look.