Woodhouse bathroom replacement

Case study

Woodhouse bathroom replacement

A tired bathroom taken back to brick and replaced with a walk in shower, wall hung sanitaryware and full height tiling, delivered by our own team from strip out to handover.

Property
Residential flat, London
Service line
Refurbishment and major works
Scope
Full bathroom replacement
Trades
Plumbing, electrical, tiling, carpentry, decorating

The project

The existing bathroom was original to the property. A panelled bath with an over bath shower, a pedestal basin and a dated close coupled WC sat against part tiled walls, with the layout wasting most of the usable floor area and the pipework showing its age behind the bath panel.

The brief was a complete replacement rather than a cosmetic refresh, so the room was stripped back to substrate. Tiles and adhesive were removed from every wall, the floor was lifted and the existing waste and supply pipework was exposed and reviewed before any new work started.

New studwork was formed to carry a wall hung WC and to conceal the pipework and cistern, giving a clean run of wall for full height tiling. First fix plumbing and electrical work followed, including the feed for the new shower, extraction and lighting, with everything set out before boarding so the finished surfaces stayed uninterrupted.

The finished room is a walk in shower with a black framed glass screen, a stone effect feature wall, a dark timber vanity unit with a counter top basin, a round mirror and a wall hung WC. One team handled the whole sequence, so the client had a single point of contact from survey through to the final clean.

Scope of works

What we delivered.

  • Full strip out of tiling, floor covering and sanitaryware
  • Removal of the existing bath and formation of a walk in shower
  • New studwork and boarding to conceal pipework and cistern
  • First and second fix plumbing to shower, basin and WC
  • Electrical works to lighting, shaver point and extraction
  • Full height wall and floor tiling
  • Vanity unit, counter top basin, mirror and accessories
  • Making good, decoration and final clean

Before and after

Drag the handle across each photo to compare.

Finished walk in shower with a black rainfall head and stone effect feature wall
Original bathroom with a panelled bath and white wall tiles before works
BeforeAfter
Drag
Drag to compare

Bath to walk in shower

Finished dark timber vanity unit, round mirror and wall hung WC
Original pedestal basin and close coupled WC before works
BeforeAfter
Drag
Drag to compare

Basin and WC area

During works

Taken back to substrate before anything new went in.

Existing WC and cupboard recorded before strip out
Bath panel removed showing the original copper pipework
Walls stripped back to substrate with adhesive removed
Room taken back to floor and walls ready for first fix
New studwork formed to carry the wall hung sanitaryware
Stripped floor and wall junction prepared for new works
Exposed waste pipework with site waste bagged and removed

Finished result

Walk in shower with black rainfall head and stone effect tiling
Black framed glass shower screen and full height tiling
Timber vanity unit, counter top basin and round mirror